The question as to when the proper time to apply the stressing force to the post tensioned cable in this type of reinforced foundation is of considerable interest. If you apply the stressing load too soon you have the danger of pulling cable anchorages out of the green concrete. If you wait too long there is a problem of excessive loads being applied to the foundation, due to the super structure framing proceeding and, probably most significant, the increase in number and width of shrinkage cracks which could occur in the un-reinforced foundation.
Post tensioned slabs should be stressed when the concrete strength designated by the engineer’s plan is reached. The practice of MLAW has been to apply stress when the concrete reaches 2000 psi. Good quality concrete should reach 2000 psi in approximately 4 days under normal curing conditions, and certainly within 7 days. If 2000 psi is not reached within 7 days, the concrete will probably not reach 3000 psi in 28 days.
Loadings should not be placed on the slab beyond the basic framing and possibly composition shingle roofing. Certainly no sheetrock or any other heavy loads should be applied to the structure before stressing the cables. Remember, the foundation slab is in a totally unreinforced condition prior to stressing. The best time to apply the stressing would be between 4 and 7 days and certainly before significant loads are applied to the foundation. The strength of the concrete at the time of the stressing should be verified by some type of indirect concrete testing procedure such as an impact hammer or other technique.
Kirby T. Meyer, P.E.
MLAW Consultants & Engineers
Originally published in MLAW Newletter, January 2006
Explore
Framing Problems
Most single and multi-family residences and significant number of small to mid size commercial structures utilize wood framing for structural support. Terms: Timber Framing – refers to heavy timber 8″ x 8” or larger. Lumber – surface finished (S4S) wood members equal to or smaller than 6″ x 6″ or 2″ x 14″. GLU-LAM – glued laminated layers…
Read MoreGeological Faults and Foundation Design
Austin and Central Texas abounds with geologic faults, the most prominent of which is the Balcones Fault, or “fault system”. These faults are especially common in a band, which runs north and south through Austin and similar areas in Georgetown, Round Rock, Buda, Kyle, San Marcos, New Braunfels and parts of San Antonio. The band…
Read More
Good afternoon on a 9 inch post tension elevated slab after our stress test is done how long before you take drive any equipment on to continue going up with or put any weight on it